لفته ع.ا. and صالح م.م. (2013) “The method of ABC and it, s roules in the Determining the cost of the Project constraction sector”,
Journal of Economics and Administrative Sciences
, 19(72), p. 32. doi:
10.33095/jeas.v19i72.944
.